Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89368
Export to Endnote
Title: | MLN 1138 Annual Technical Report for the period 1 July 2011 to 30 June 2012 Maranboy |
Title Holder / Company: | Softwood Plantations Outback Metals |
Report id: | CR2012-0532 |
Tenure: | MLN1138 |
Year: | 2012 |
Abstract: | Work undertaken during this reporting period included a field trip in October 2011 with results from rock chip sampling indicating the possibility of sub-parallel tin veins between the main North and South Mining Leases 2km apart. A preliminary soil geochemistry field program was completed in the first week of October |
Date Added: | 25-Sep-2019 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
MLN1138_2012_A.pdf | 152.5 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.