Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89208
Export to Endnote
Title: EL 28321 Annual Report Mount Todd Project for the period ended 2 May 2012
Title Holder / Company: Vista Gold Australia
Report id: CR2012-0320
Tenure: EL28321
Year: 2012
Author: Stockfeld, J
Harris, P
Abstract: EL 28321 is situated to the west of the Stuart Highway, 40 km due south of the town of Pine Creek. This annual report documents the work completed on the licence for the period from May 3rd, 2011 to May 2nd, 2012. EL 28321 is the most recent addition to the Vista Gold tenement package on the Mt Todd project, having been granted on May 3rd, 2011. The tenement consists of 63 graticular blocks, being 13km wide and 20km long with a total area of 198.3 square km. Vista Gold Australia Pty Ltd. is the operator and manager of the exploration work. Work on the project during the Reporting Year consisted of testing a limestone deposit in order to determine its suitability for quarrying to supply the Mt Todd minesite. This included diamond drilling (six holes for 360.4m).
Date Added: 22-Aug-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28321_2012_A_01.pdf804.02 kBPDF Add
EL28321_2012_A_02_DrillCollars.txt2.01 kBText Add
EL28321_2012_A_03_Lithologs.txt8.58 kBText Add
EL28321_2012_A_04_DownholeGeochem.txt41.65 kBText Add
EL28321_2012_A_05_DownholeSurveys.txt1.79 kBText Add
EL28321_2012_A_06_FileListing.txt617 BText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader