Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89195
Export to Endnote
Title: | Combined Annual Technical Report for period 5 March 2011 to 4 March 2012 EL 26704 Ingellina Gap, EL 26848 Walabanba, EL 27115 Anningie, EL 27876 Englands Well |
Title Holder / Company: | Toro Energy |
Report id: | CR2012-0112 |
Tenure: | EL26704; EL26848; EL27115; EL27876 |
Year: | 2012 |
Author: | Rawlings, D Sullivan, C |
Abstract: | During 2011, Toro completed a 14 hole, aircore program testing airborne EM defined, palaeochannels with limited success. Although reduced and oxidized sands to 200m were intersected, no uranium radiometric or assay anomalies are reported. No exploration is proposed for 2012 and this group of tenements is considered low priority for Toro. Toro are currently pursuing JV opportunities over the project area. |
Date Added: | 20-Aug-2019 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR145_2012_GA_01.pdf | 2.01 MB | Add | |
GR145_2012_GA_02_DHLocations.txt | 2.39 kB | Text | Add |
GR145_2012_GA_03_DHLithology.txt | 142.45 kB | Text | Add |
GR145_2012_GA_04_DHAssay.txt | 27.38 kB | Text | Add |
GR145_2012_GA_05_DHRadiometrics.txt | 2.63 MB | Text | Add |
GR145_2012_GA_06_LithologyCode.pdf | 27.38 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.