Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89195
Export to Endnote
Title: Combined Annual Technical Report for period 5 March 2011 to 4 March 2012 EL 26704 Ingellina Gap, EL 26848 Walabanba, EL 27115 Anningie, EL 27876 Englands Well
Title Holder / Company: Toro Energy
Report id: CR2012-0112
Tenure: EL26704;  EL26848;  EL27115;  EL27876
Year: 2012
Author: Rawlings, D
Sullivan, C
Abstract: During 2011, Toro completed a 14 hole, aircore program testing airborne EM defined, palaeochannels with limited success. Although reduced and oxidized sands to 200m were intersected, no uranium radiometric or assay anomalies are reported. No exploration is proposed for 2012 and this group of tenements is considered low priority for Toro. Toro are currently pursuing JV opportunities over the project area.
Date Added: 20-Aug-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR145_2012_GA_01.pdf2.01 MBPDF Add
GR145_2012_GA_02_DHLocations.txt2.39 kBText Add
GR145_2012_GA_03_DHLithology.txt142.45 kBText Add
GR145_2012_GA_04_DHAssay.txt27.38 kBText Add
GR145_2012_GA_05_DHRadiometrics.txt2.63 MBText Add
GR145_2012_GA_06_LithologyCode.pdf27.38 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader