Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89124
Export to Endnote
Title: | EL 26397 Abner Project Annual report for the period 26 March 2017 to 25 March 2018 |
Title Holder / Company: | Legend International Holdings |
Report id: | CR2018-0217 |
Tenure: | EL26397 |
Year: | 2018 |
Author: | Chin, N |
Abstract: | This report outlined exploration activities conducted over EL 26397 between 26 March 2017 and 25 May 2018). EL 26397 is a part of Abner Project and was accepted for group reporting (GR140/09). With the cessation of all other member exploration licences in the GR140, amalgamated reporting for EL 26397 was revoked on 18 December 2015. No field exploration activities were undertaken during the reporting period. However, all retained unprocessed diamond exploration samples collected from the EL26397 that were kept at the company's Wangara Laboratory in Perth were transferred temporarily to the local storage facility. This is due to the permanent closure of the laboratory. These retained samples are expected to be shipped to the Merlin Mine for further work. Consequently, proposed analysis of a selection of left over unprocessed loam samples collected in 2011-2012 was not completed. Legend intends to complete this work. It is anticipated that acquired analytical results will help to fill wide spatial gaps that exist between the data points. Likewise, derived distribution of positive results from this work and available historical data within the tenement may display a clear trend that point to the definitive source of diamond indicator minerals. |
Date Added: | 6-Aug-2019 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26397_2018_A.pdf | 2.33 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.