Title: | Palm Valley 3 Workover Report |
Title Holder / Company: | Magellan Petroleum |
Report id: | PR1973-0030 |
Tenure: | OP175 |
Year: | 1973 |
Corporate Author: | Magellan Petroleum |
Abstract: | After the discussion regarding the proposed workover of Palm Valley 3 and a complete review of the work required on both Palm Valley 3 and 4, it was recommended to conduct a workover program as per the revised AFE. The program calls for the placing of a blanking plug at the bottom of the tubing string to allow the present string to be depressured and the new 1.9' tubing installed inside the present 3.5'/4.5' tubing. After running the tubing and installing the Christmas Tree, this blanking plug could be opened to reinstate gas production. |
Date Added: | 20-Jun-2019 |
Appears in Collections: | Petroleum and Geothermal Tenure Reports (PEX Tenure) |