Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88820
Export to Endnote
Title: Westminster Project Annual Report for the period 1 January 2011 to 31 December 2011
Title Holder / Company: Truscott Mining
Report id: CR2011-1205
Tenure: MLC511
Year: 2011
Author: Hanson, JA
Abstract: Exploration activities during the reporting period have included: detailed prospect structural interpretation and mapping, resource calculation and reverse circulation drilling, plus drill site rehabilitation. This work has further confirmed the potential for MLC 511 to host significant gold and base metal ore grade mineralisation. Field mapping indicated that the alignment of the targeted ore zone within MLC 511, along a strike of 068 degrees is crosscut and enriched by shearing structures having a 297 degrees orientation Mapped structures define positions within a three dimensional space that regional deformation events interact. The interpreted interaction zones are seen as places for potential ironstone hosted high grade gold mineralisation. The drilling has defined a target matrix that includes 3 potential mineralised lenses within MLC 511 and a further 4 lenses in MLC 511 that cross into Tenement MA 25952. Each lens is considered to constitute a stacked series of mineralised ironstone ore pods. Drilling has confirmed the presence of ore grade gold mineralisation along two separate ironstone pods. Drilling along zones of ironstone mineralisation has interpreted to be the down plunge extension of the mineralisation of the historical Wheal Doria workings. A lower zone was also identified and lies below the historical workings and is associated with strong carbonate zones of alteration.
Date Added: 18-Jun-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
MLC511_2011_A_01.pdf1.73 MBPDF Add
MLC511_2011_A_02_Appendix1.xlsx17.32 kBMicrosoft Excel XML Add
MLC511_2011_A_03_Appendix2.xlsx18.48 kBMicrosoft Excel XML Add
MLC511_2011_A_04_Appendix3.xlsx214.26 kBMicrosoft Excel XML Add
MLC511_2011_A_05_Appendix4.xlsx386.73 kBMicrosoft Excel XML Add
MLC511_2011_A_06_Appendix5.pdf55.5 kBPDF Add
MLC511_2011_A_07_Appendix6.pdf331.82 kBPDF Add
MLC511_2011_A_08_Appendix7.pdf471.24 kBPDF Add
MLC511_2011_A_09_Appendix8.pdf54.45 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader