Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88753
Export to Endnote
Title: Combined Annual Report EL 5888, EL 5889, EL 8809 and EL 27705 GR163 Birrindudu Project from 16 November 2010 to 15 November 2011
Title Holder / Company: ABM Resources
Report id: CR2011-1044
Tenure: EL5888;  EL5889;  EL8809;  EL27705
Year: 2011
Author: Rohde, J
Abstract: Exploration during the reporting period included surface sampling and partially a soil sampling program orientation study over an area of known mineralisation on ABM's Twin Bonanza project. 88 soil samples were taken from EL 8809. As a result of the soil sampling program orientation study the best assay method was determined to be the Ionic leach laboratory method to analyse for a suite of elements, a method which takes advantage of the now available low detection laboratory technology. The sampling program was cut short drastically by severe bush fires in the Birrindudu project area. At the time of writing this report the results were still pending.
Date Added: 30-May-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR163_2011_GA_01.pdf1.58 MBPDF Add
GR163_2011_GA_02_SurfaceGeochem.txt29.49 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader