Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88686
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Henderson, I | en_US |
dc.date.accessioned | 2019-05-22T00:40:44Z | - |
dc.date.issued | 2011 | en_US |
dc.identifier.govdoc | CR2011-0798 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88686 | en_US |
dc.description.abstract | Exploration carried out on the Westminster tenements during 2010-2011 included; data compilation, field mapping, 17 RC/Diamond holes for 2763m and rehabilition. Field mapping combined with geophysical and drilling data have identified highly mineralised trends and structures within A 25952. Significant high grade results returned drilling included: 2m at 81.0g/t Au, 5201g/t Bi, in 11WMRC082, 2m at 33.0g/t Au, 1747g/t Bi, in 11WMRC083 and 8m at 5.1g/t Au, 75g/t Bi, in 11WMRC093. Further work at Westminster will focus on targeting ore enrichment developed at the intersection between lines of mineralisation and thickened lenses of ironstone. | en_US |
dc.subject.classification | Base metals | en_US |
dc.subject.classification | Gold | en_US |
dc.subject.classification | Copper | en_US |
dc.subject.classification | Regional geology | en_US |
dc.subject.classification | Local geology | en_US |
dc.subject.classification | Mineralisation | en_US |
dc.subject.classification | Previous exploration | en_US |
dc.subject.classification | Geophysical interpretation | en_US |
dc.subject.classification | Data compilation | en_US |
dc.subject.classification | Mapping | en_US |
dc.subject.classification | Drilling | en_US |
dc.subject.classification | RC drilling | en_US |
dc.subject.classification | Diamond drilling | en_US |
dc.subject.classification | Drill collars | en_US |
dc.subject.classification | Drill hole logs | en_US |
dc.subject.classification | Drill hole data | en_US |
dc.subject.classification | Drill core sampling | en_US |
dc.subject.classification | Drill cuttings sampling | en_US |
dc.subject.classification | Cross sections | en_US |
dc.subject.classification | Assaying | en_US |
dc.subject.classification | Assay value | en_US |
dc.subject.classification | Rehabilitation | en_US |
dc.subject.classification | Mineral resources | en_US |
dc.subject.classification | Inferred mineral resources | en_US |
dc.title | Westminster Project Combined annual report for the period 25 October 2010 to 24 October 2011, A 25952, A 26500, A 26558 | en_US |
dc.relation.isatmap100 | Tennant Creek 5758 | en_US |
dc.relation.isatmap250 | Tennant Creek SE5314 | en_US |
dc.relation.isatgeolprovince | Tennant Region | en_US |
dc.description.stratname | Warramunga Formation | en_US |
dc.description.stratname | Flynn Subgroup | en_US |
dc.description.geochemicalsampling | 1493 Drill samples | en_US |
dc.description.drilling | 1 Diamond hole for 210.9 m with RC pre-collar (10WMDH56A) | en_US |
dc.description.drilling | 5 RC holes for 938 m with RAB hammer pre-collars (11WMRC083, 11WMRC085 and 11WMRC091 to 93) | en_US |
dc.description.drilling | 11 RC holes for 2001 m (10WMRC056, 10WMRC068, 10WMRC069, 10WMRC072 to 75, 10WMRC077, 10WMRC081, 10WMRC082, 10WMRC084) | en_US |
dc.description.mineprospectname | Big Ben | en_US |
dc.description.mineprospectname | Peter Pan | en_US |
dc.identifier.tenure | A25952 | en_US |
dc.identifier.tenure | A26500 | en_US |
dc.identifier.tenure | A26558 | en_US |
dc.description.modifyhistory | 29/04/2019 | en_US |
dc.contributor.holder | Truscott Mining | en_US |
dc.identifier.collectionname | Minerals Exploration Reports (MEX) | en_US |
dc.identifier.govdocprefix | CR2011 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR126_2011_GA.pdf | 2.25 MB | Add | |
CR2011-0798_Appendix_10_Resource_Notes.zip | 1.46 MB | ZIP | Add |
CR2011-0798_Appendix_2_Verification_Report.zip | 15.73 kB | ZIP | Add |
CR2011-0798_Appendix_3_TRM_Lithological_Codes.zip | 364.35 kB | ZIP | Add |
CR2011-0798_Appendix_4_Digital_Data_Files.zip | 83.83 kB | ZIP | Add |
CR2011-0798_Appendix_5_Geology_Plans.zip | 299.65 kB | ZIP | Add |
CR2011-0798_Appendix_6_Drill_Cross_Sections.zip | 320.52 kB | ZIP | Add |
CR2011-0798_Appendix_7_NT_Dept_Resources_Report.zip | 1.52 MB | ZIP | Add |
CR2011-0798_Appendix_9_Report_Figures_Photos.zip | 8.16 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.