Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88603
Export to Endnote
Title: | Combined annual report EL 9250 Chapman Hill and EL 27812 Plucky, Supplejack Project from the 18 October 2010 to 15 October 2011 |
Title Holder / Company: | ABM Resources Australian Tenement Holdings |
Report id: | CR2011-0737 |
Tenure: | EL9250; EL27812 |
Year: | 2011 |
Author: | Rohde, J |
Abstract: | Exploration during the year focused a RC drilling program (14 holes for 2,479m) on the Hyperion Central and Hyperion South prospects. In addition one hole was completed at the Brokenwood prospect located 6 kilometres to the south of Hyperion. The best intersections returned using a 1.0 gram per tonne cut-off included: 8 m at 2.86 grams per tonne gold in hole HYRC100004 (1.0 gram per tonne cut-off); 5 m at 3.65 grams per tonne gold in hole HYRC100005 (1.0 gram per tonne cut-off); 7 m at 2.26 grams per tonne gold in hole HYRC100008 (1.0 grams per tonne cut-off); and 11 m at 4.29 grams per tonne gold in hole HSRC100004 (1.0 gram per tonne cut-off). |
Date Added: | 10-May-2019 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR166_2011_GA.pdf | 1.74 MB | Add | |
CR2011-0737_Appendices.zip | 358.76 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.