Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88603
Export to Endnote
Title: Combined annual report EL 9250 Chapman Hill and EL 27812 Plucky, Supplejack Project from the 18 October 2010 to 15 October 2011
Title Holder / Company: ABM Resources
Australian Tenement Holdings
Report id: CR2011-0737
Tenure: EL9250;  EL27812
Year: 2011
Author: Rohde, J
Abstract: Exploration during the year focused a RC drilling program (14 holes for 2,479m) on the Hyperion Central and Hyperion South prospects. In addition one hole was completed at the Brokenwood prospect located 6 kilometres to the south of Hyperion. The best intersections returned using a 1.0 gram per tonne cut-off included: 8 m at 2.86 grams per tonne gold in hole HYRC100004 (1.0 gram per tonne cut-off); 5 m at 3.65 grams per tonne gold in hole HYRC100005 (1.0 gram per tonne cut-off); 7 m at 2.26 grams per tonne gold in hole HYRC100008 (1.0 grams per tonne cut-off); and 11 m at 4.29 grams per tonne gold in hole HSRC100004 (1.0 gram per tonne cut-off).
Date Added: 10-May-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR166_2011_GA.pdf1.74 MBPDF Add
CR2011-0737_Appendices.zip358.76 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader