Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88600
Export to Endnote
Title: EL 24115 and EL 24195 Bowgan Project Seventh annual report for the period 13 October 2010 to 12 October 2011
Title Holder / Company: Marengo Mining
Bowgan Minerals
Report id: CR2011-0797
Tenure: EL24115;  EL24195
Year: 2011
Author: Price, G
Abstract: Exploration at the Bowgan Project is currently targeting the potential occurrence of economic uranium, gold and base-metal mineralisation. Exploration activity during the current reporting period included completion of 85.076 line-kilometres of magnetic surveying (on-foot), recording of 308 point readings by hand-held spectrometer, completion of reconnaissance and detailed mapping and outcrop sampling in 8 target areas. Data collation, processing and interpretation work is currently ongoing. Detailed evaluation of exploration data conducted during the reporting period has identified 6 key targets out of the 19 originally designated targets, plus 2 additional targets. On-going exploration proposed at the Bowgan Project aimed at the generation of drilling targets in each of these areas.
Date Added: 10-May-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR242-12_2011_GA_01.pdf2.64 MBPDF Add
GR242-12_2011_GA_02_Surface_Spectrometer.txt33.76 kBText Add
GR242-12_2011_GA_03_Surface_Rockchip.txt11.31 kBText Add
GR242-12_2011_GA_04_Surface_Vegetation.txt24.49 kBText Add
CR2011-0797_Geophysics.zip2.47 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader