Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88579
Export to Endnote
Title: Mount Shoobridge Project ERL 88 Annual report for the period 19 September 2010 to 18 September 2011
Title Holder / Company: Altura Exploration
Report id: CR2011-0760
Tenure: ERL88
Year: 2011
Author: Bourke, BG
Abstract: Exploration conducted on ERL 88 during the reporting period has included ongoing literature reviews, the acquisition and imaging of the Geoscience Australia airborne Tempest EM survey data, the compilation of all historical drilling completed on the Shoobridge gold prospect and the completion of both geological modelling and a mining scoping study. The report also provides the results of the 2010 RC drilling which were not available at the time the 2010 report was prepared.
Date Added: 7-May-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
ERL88_2011_A.pdf593.76 kBPDF Add
CR2011-0760_Appx2_ERL88_-_Data_Files_2010_2011.zip104.63 kBZIP Add
CR2011-0760_Block_Model_Resosurce_Estimation_-_Scoping_Study_2011.zip2.05 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader