Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88579
Export to Endnote
Title: | Mount Shoobridge Project ERL 88 Annual report for the period 19 September 2010 to 18 September 2011 |
Title Holder / Company: | Altura Exploration |
Report id: | CR2011-0760 |
Tenure: | ERL88 |
Year: | 2011 |
Author: | Bourke, BG |
Abstract: | Exploration conducted on ERL 88 during the reporting period has included ongoing literature reviews, the acquisition and imaging of the Geoscience Australia airborne Tempest EM survey data, the compilation of all historical drilling completed on the Shoobridge gold prospect and the completion of both geological modelling and a mining scoping study. The report also provides the results of the 2010 RC drilling which were not available at the time the 2010 report was prepared. |
Date Added: | 7-May-2019 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
ERL88_2011_A.pdf | 593.76 kB | Add | |
CR2011-0760_Appx2_ERL88_-_Data_Files_2010_2011.zip | 104.63 kB | ZIP | Add |
CR2011-0760_Block_Model_Resosurce_Estimation_-_Scoping_Study_2011.zip | 2.05 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.