Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88518
Export to Endnote
Title: Annual technical report for EL 28857 Second Chance, Allamber Project for the period 24 February 2012 to 23 February 2013
Title Holder / Company: Element 92
Report id: CR2013-0218
Tenure: EL28857
Year: 2013
Author: Mill, P
Mees, H
Abstract: During the period under review, significant on-ground works were undertaken in EL 28857 including geological reconnaissance and mapping, rock chip sampling (2), soil sampling (125), ground magnetic surveys (114.5 line km) and RC drilling (12 holes, 949m). Activities completed in EL 28857 formed part of significant works targeting the contact between Allamber Springs Granite and metasediments of the Masson Formation, in this and adjacent titles, for skarn-type mineralisation. The discovery of significant sulphide mineralisation in the forms of; i) a laminated quartz-pyrrhotite-pyrite-chalcopyrite vein or lode (Tarpon Lode) and ii) a number of narrow quartz-sulphide veins (the Herringbone Lodes) within granite in EL 28857 has presented a new type of exploration target, and significantly enhanced the prospectivity of all adjacent titles.
Date Added: 16-Apr-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28857_2013_A_01.pdf7.49 MBPDF Add
CR2013-0218_Appendix1_Surface_Sampling_Data.zip1.25 MBZIP Add
CR2013-0218_Appendix2_Drilling_Data.zip84.37 kBZIP Add
CR2013-0218_Appendix3_Ground_Mag.zip186.94 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader