Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88504
Export to Endnote
Title: Annual report EL 25657 Cloughs Dam for the period 30 August 2010 to 29 August 2011
Title Holder / Company: WDR Base Metals
Crossland Uranium Mines
Report id: CR2011-0652
Tenure: EL25657
Year: 2011
Author: Melville, PM
Abstract: Stream sediment sampling was the only field activity for the year. A total of 185 samples were collected. To date 93 analyses have been received, which relate to the initial phase of sampling carried out in early 2011. The more recent sampling program was completed in mid August with the processing underway at the time of writing this report. All samples are sieved then concentrated on-site by gravity separation utilising a Wilfley Table. The dried sample is then passed through a magnetic separator to give a magnetic and non- magnetic fraction. Multi-element analyses including all REE is conducted by ALS Perth on both the non-magnetic and magnetic fraction.
NOTESee CR2012-0755 for the remainder of the stream sediment results.
Date Added: 16-Apr-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25657_2011_A_01.pdf967.99 kBPDF Add
CR2011-0652_EL25657_2011_A_02_Cloughs_Dam_SampLoc-Assays.pdf75.82 kBPDF Add
CR2011-0652_EL25657_2011_A_03_Cloughs_Dam_SampLoc-Assays.xls190.5 kBMicrosoft Excel Add
CR2011-0652_GIS_Files.zip7.74 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader