Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88479
Export to Endnote
Title: Combined annual report EL 25133 and EL 25135 Year 5 Period ending 12 July 2011
Title Holder / Company: Korab Resources
Report id: CR2011-0492
Tenure: EL25133;  EL25135
Year: 2011
Author: Earthrowl, JA
Abstract: Korab Resources Ltd has carried out surface rock sampling with supporting spectrometry on EL 25133. On EL 25135 the company has spent considerable time sorting out the best place to site the planned 2011 RC drill holes due to the proximity of the Stuart Highway.
Date Added: 10-Apr-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25133_2011_A_01.pdf402.67 kBPDF Add
EL25133_2011_A_02_Appendix1a.xls31.5 kBMicrosoft Excel Add
EL25133_2011_A_03_Appendix1b.xls40.5 kBMicrosoft Excel Add
EL25133_2011_A_04_Appendix2a.xls23.5 kBMicrosoft Excel Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader