Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88419
Export to Endnote
Title: | Annual report on EL 24549 Allamber 1 for the period 23 September 2015 to 22 September 2016 |
Title Holder / Company: | Element 92 Thundelarra Exploration |
Report id: | CR2016-0561 |
Tenure: | EL24549 |
Year: | 2016 |
Author: | Petrella, L Vieru, C |
Abstract: | Exploration work undertaken by Element 92 during the reporting period has consisted of comprehensive geological, structural and lithostratigraphic assessment of the previous data. Access on the ground was constantly denied by the station owner due to the interference with the hunting activities which are the core of his business. Consequently, only rehabilitation was undertaken towards the end of the hunting season when the site access was allowed. Rehabilitation was completed for all previous 56 holes. They were plugged and the drill pads and access roads (total approximate length of 1.7km) were ripped by a grader. |
Date Added: | 3-Apr-2019 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24549_2016_A.pdf | 973.82 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.