Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88277
Export to Endnote
Title: | Combined annual technical report for period 5 March 2010 to 4 March 2011 EL 26704 Ingellina Gap, EL 26848 Walabanba, EL 27115 Anningie |
Title Holder / Company: | Toro Energy |
Report id: | CR2011-0090 |
Tenure: | EL26704; EL26848; EL27115 |
Year: | 2011 |
Author: | Rawlings, D Sullivan, C |
Abstract: | Exploration activities during the period have involved: aboriginal Native Title Clearance conducted by AAPA; an MMP was also completed and approved by DoR; and two Aircore holes for 357 m were drilled. Drilling was terminated after only a few days due to unseasonally heavy rainfall. The program will be completed in 2011. |
Date Added: | 4-Mar-2019 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR145-10_2011_GA_01.pdf | 2.17 MB | Add | |
GR145-10_2011_GA_02_DHLocations.txt | 1.39 kB | Text | Add |
GR145-10_2011_GA_03_DHLithology.txt | 17.35 kB | Text | Add |
GR145-10_2011_GA_04_DHAssay.txt | 7.58 kB | Text | Add |
GR145-10_2011_GA_05_File_Verification.txt | 3.81 kB | Text | Add |
GR145-10_2011_GA_06_DHGamma.txt | 717.76 kB | Text | Add |
GR145-10_2011_GA_07_Lithology_Code.pdf | 74.7 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.