Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88267
Export to Endnote
Title: Partial relinquishment report EL 30817 to 22 October 2018
Title Holder / Company: Ripple Resources
Report id: CR2018-0552
Tenure: EL30817
Year: 2018
Author: Wilkins, N
Abstract: Ripple Resources is a fully owned subsidiary of Armour Energy Ltd. Armour has been exploring the gas and oil resources of the McArthur Basin, and has made a significant gas discovery in the Glyde sub basin. Ripple has taken up selected Exploration Licences within the Victoria River area, on the basis of the known association between petroleum and zinc - lead mineralisation within the Mount Isa and McArthur Basins. The association is intimate in the case of the unmetamorphosed Century SEDEX deposit, as well as a number of the coarser grained breccia hosted deposits. Previous exploration work and NT government drilling has demonstrated regional scale petroleum and base metal generation in dolomites of the Skull Creek formation exposed within the licence area. At this point the known mineralisation is coarse grained and infills coarse vugs in the dolomites. This Mississippi Valley and shear hosted style is associated with the larger Sedex style at McArthur River and Century. It is hoped that such an association will be found at Victoria River. The principal targeting methods will initially be gravity, geochemistry, IP geophysics and geological mapping. The work during the past two years has been limited to a compilation of the previous data. A number of broad target areas have been selected on the basis of strong geochemistry and underlying or adjacent gravity highs. The pattern of gravity highs and geochemical peaks indicate that blind bodies of dense structurally controlled sulphide - dolomite introduction occur around the domes. The program of mapping and detailed sampling supported by IP geophysics has been postponed from year 2 to year 3 as cash flows from new projects elsewhere provide funding. In September 2018, 4 sub-blocks were offered for relinquishment. Eight sub-blocks remain for the third year.
Date Added: 27-Feb-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL30817_2018_P.pdf2.23 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader