Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88241Export to Endnote
| Title: | EL 23624 Renner Springs Project Annual report for period 24 February 2010 to 23 February 2011 and final report for period 24 February 2003 to 23 February 2011 |
| Title Holder / Company: | OM Manganese |
| Report id: | CR2011-0053 |
| Tenure: | EL23624 |
| Year: | 2011 |
| Author: | Reddell, CT |
| Abstract: | Exploration activity for year 1 to 8 included field inspection, reconnaissance mapping, interpretation of Aster spectral imagery, helicopter-borne SkyTEM flown on 200m spaced lines (in-filled to 100m spaced lines over main prospects), airborne magnetic and radiometric surveys on 150m spaced lines, aerial photography and regional mapping of geology, structure and alteration at 1:20,000 scale. Year 8 activity included the digitising and reporting of the 1:20,000 scale mapping by Dr Tim Blake. |
| NOTE: | Additional geophysics and data are available on request |
| Date Added: | 22-Feb-2019 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL23624_2011_S.pdf | 1.58 MB | Add | |
| EL23624_2011_S_Plate1_20K_Geology_Mapping.pdf | 1.08 MB | Add | |
| EL23624_2011_S_Plate2_20k_Mapping_Units.pdf | 441.39 kB | Add | |
| CR2011-0053_Appendix_1_-_Eliyahu,_A._(Jan_'07).zip | 38.73 MB | ZIP | Add |
| CR2011-0053_Appendix_2_-_Eliyahu,_A._(July_'07).zip | 15.58 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.