Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88085
Export to Endnote
Title: | Bridging report EL 23173 Mount Bundy Project 19 September 2010 to 15 December 2010 |
Title Holder / Company: | Crocodile Gold |
Report id: | CR2010-1154 |
Tenure: | EL23174 |
Year: | 2010 |
Author: | Watson, M |
Abstract: | During the reporting period, anomalous results from soil sampling was followed up by 504m of RC drilling. Preliminary results from field tests using a Niton hand-held XFR returned base metal values in order of 100-400ppm from hole MBRC043. Hole MBRC045 returned an infield value of 1113ppm Zn over a 1m intersection of black shale. During the next 2010-2011 reporting period, exploration activities for EL 23174 will include a thorough review of all regional and local scale geophysical data. There will also be a review of all the regional exploration work completed by JV partner Rum Jungle. This will include follow up work on geochemical sampling from Rum Jungle drilling, exploring for copper/gold mineralisation. |
Date Added: | 20-Dec-2018 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL23174_2010_B_01.pdf | 636.24 kB | Add | |
EL23174_2010_B_02_assays.txt | 9.93 kB | Text | Add |
EL23174_2010_B_03_Collars.txt | 477 B | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.