Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88084
Export to Endnote
Title: Bridging report EL 24682 Mount Bundey Project 2 February 2010 to 15 December 2010
Title Holder / Company: Crocodile Gold
Report id: CR2010-1156
Tenure: EL24682
Year: 2010
Author: Watson, M
Abstract: No exploration work conducted on EL 24682 during the reporting period. During the 2011 reporting period, exploration activities for EL 24682 will include a program of geological mapping and some soil/rock chip sampling. If results are encouraging it may lead to a program of RC or RAB drilling. Samples collected during drilling will be assayed for gold and base metals.
Date Added: 20-Dec-2018
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24682_2010_B.pdf650.07 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader