Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88004
Export to Endnote
Title: | Mount Shoobridge Project EL 25181 Annual report for the period 30 October 2009 to 29 October 2010 |
Title Holder / Company: | Altura Exploration |
Report id: | CR2010-0881 |
Tenure: | EL25181 |
Year: | 2010 |
Author: | Bourke, BG |
Abstract: | Exploration studies undertaken on EL 25181 during the reporting period included the interpretation of the airborne VTEM survey completed in September 2009, the completion of an airborne magnetic and radiometric survey, reverse circulation drilling, the acquisition of World View satellite photography and the field reconnaissance of airborne targets. Two RC holes were completed in September 2010 within the Long Island prospect area. Two other hoes planned for the Long Island Uranium Anomaly were unable to be drilled as the drill rig was unable to locate itself on the drill pads. |
Date Added: | 4-Dec-2018 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25181_2010_A_01.pdf | 1.47 MB | Add | |
EL25181_2010_A_02_HaddingtonResourcesProcessingReport.pdf | 68.98 kB | Add | |
EL25181_2010_A_03_NT_EL25181_LongIslandFlight_Annual2010.pdf | 4.19 MB | Add | |
EL25181_2010_A_04_LI_OCT2010.xlsx | 72.84 kB | Microsoft Excel XML | Add |
EL25181_2010_A_05_LI_OCT2010_assay.xlsx | 13.29 kB | Microsoft Excel XML | Add |
CR2010-0881_Geophysics.zip | 10.6 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.