Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87668
Export to Endnote
Title: | Annual report for EL 30051 Arnhem Project, reporting period 16 May 2014 to 15 May 2018 |
Title Holder / Company: | Myanmar Metals |
Report id: | CR2018-0232 |
Tenure: | EL30051 |
Year: | 2018 |
Author: | Murphy, J |
Abstract: | EL 30051 is situated over geology that is favourable for base metal mineralisation and there are known deposits on the tenement. Myanmar Metals surrendered the tenement to concentrate on core Project, the lead-zinc-silver (nickel-cobalt) Bawdwin Project located in Myanmar. |
Date Added: | 20-Aug-2018 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL30051_2018_S.pdf | 3.69 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.