Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87610
Export to Endnote
Title: EL 29046 Fourth annual report for the period 3 July 2015 to 2 July 2016
Title Holder / Company: GRIGM Resources
Report id: CR2016-0394
Tenure: EL29046
Year: 2016
Author: Lu, J
Abstract: Work completed in the past twelve months include: Field reconnaissance and sampling along the entire 12.5km outcrops of malachite-bearing greenish siltstone/shale near the bottom of Areyonga Formation; Field investigation, inspect outcrops along the surrounding ridges; and Ground-check soil geochemistry results obtained in 2014-2015.
Date Added: 14-Aug-2018
Appears in Collections:Minerals Exploration Reports (MEX)



Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader