Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87558
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorHartshorn, Gen_US
dc.date.accessioned2018-07-31T01:49:18Z-
dc.date.issued2009en_US
dc.identifier.govdocCR2009-0798en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87558en_US
dc.description.abstractEL 4170 Cato Plateau and EL 4171 Cato River were applied for by BHP Minerals Pty Ltd (BHP) on 3 October 1982. EL 4170 was granted on 14 October 2004, EL 4171 was granted on 12 September 2005. Rio Tinto Exploration Pty Limited (RTX) signed an agreement with BHP on 27 March 2000 whereby RTX took over management and ownership of the tenements. An amendment to this agreement was signed on 21 December 2007 which gave Rio the rights to explore and mine for bauxite and BHPB the equivalent rights to manganese. The original EL 4170 tenement application covered an area of 593.5km2 of which only 57.0km2 was granted. The remainder of the area was split off into a new application, EL 24389 and put into moratorium. The original EL 4171 tenement application covered an area of 846.0km2 of which 598.2km2 was granted with the remaining areas split off into new applications (ELA 24829 and 24830). The tenements are located 30km west of Nhulunbuy, east Arnhem Land and consequently are processed under the Aboriginal Land Rights Act 1975 (ALRA). Combined reporting of EL 4171 and EL 4170 was granted on 3 August 2007, and called the 'Cato Project'. The Cato Project forms part of the larger contiguous tenement package in east Arnhem Land, which is considered prospective for bauxite and manganese. This combined annual report describes the exploration completed during the fifth tenure year of EL 4170 and the fourth tenure year of EL 4171. Exploration was conducted by both Rio Tinto for bauxite and BHPB for manganese. The simultaneous activities form part of the amended 2007 agreement. By far the most activities conducted during the year were by BHPB focussed on manganese. The details of this work including raw data and recommendations are in the report by BHPB. The Cato Project covers a spur of the Cato Plateau, which is a known area of bauxite of similar style to the nearby world class Gove deposit. It also covers extensions of subtle, coastal plateaus and a small isolated plateau. The area is also prospective for manganese. Exploration for bauxite was limited during the year to the completion of the drilling on the Cato East Plateau (EL 4170) and collection of 20 rock samples within EL 4171. A total of 310.5 metres in 52 vacuum drill holes were conducted on the Cato East plateau. These holes targeted pisolitic bauxite on a remnant outlier of the main Cato Plateau. The results of the drilling confirmed the presence of bauxite however all holes were high silica(>15% SiO2). Assay results for the rock samples collected on EL 4171 have not been received to date Manganese work by BHPB included a small EM survey and drilling of 21 RC holes.en_US
dc.subject.classificationBauxiteen_US
dc.subject.classificationManganeseen_US
dc.subject.classificationExploration historyen_US
dc.subject.classificationGeomorphologyen_US
dc.subject.classificationGeologyen_US
dc.subject.classificationGeophysical surveysen_US
dc.subject.classificationAerial geophysical surveysen_US
dc.subject.classificationAerial EM surveysen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationRC drillingen_US
dc.subject.classificationVacuum drillingen_US
dc.subject.classificationDrill collarsen_US
dc.subject.classificationDrill hole logsen_US
dc.subject.classificationGeochemical explorationen_US
dc.subject.classificationGrab samplesen_US
dc.subject.classificationGeochemical samplingen_US
dc.subject.classificationDrill cuttings samplingen_US
dc.subject.classificationAssayingen_US
dc.subject.classificationAssay valueen_US
dc.titleCombined annual report Cato Project for the Period 14 October 2008 to 13 October 2009 EL 4170 Cato Plateau and EL 4171 Cato Riveren_US
dc.relation.isatmap100Arnhem 6173en_US
dc.relation.isatmap100Gove 6273en_US
dc.relation.isatmap250Arnhem Bay SD5303en_US
dc.relation.isatmap250Gove SD5304en_US
dc.relation.isatgeolprovinceArnhem Inlieren_US
dc.relation.isatgeolprovinceCarpentaria Basinen_US
dc.relation.isatgeolprovinceCenozoic sedimentsen_US
dc.description.stratnameYirrkala Formationen_US
dc.description.geochemicalsampling876 Drill samplesen_US
dc.description.drilling21 RC holes for 954 m (EARC106, EARC108, EARC110, EARC113, EARC18, EARC34, EARC47, EARC70, EARC72, EARC74, EARC76, EARC77, EARC79, EARC81, EARC82, EARC88, EARC92, EARC94, EARC97, EARC98, EARC99)en_US
dc.description.drilling52 Vacuum holes for 310.5 m (VM08CE01 to VM08CE52)en_US
dc.identifier.tenureEL4170en_US
dc.identifier.tenureEL4171en_US
dc.description.modifyhistory13/11/2009en_US
dc.description.modifyhistory08/12/2009en_US
dc.description.modifyhistory05/06/2013en_US
dc.description.modifyhistory11/11/2013en_US
dc.description.modifyhistory07/02/2014en_US
dc.description.modifyhistory17/11/2016en_US
dc.description.modifyhistory12/06/2018en_US
dc.contributor.holderRio Tinto Explorationen_US
dc.contributor.holderBHP Billiton Mineralsen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2009en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR20090798_2009_GA_01.pdf100.88 kBPDF Add
CR20090798_2009_GA_02_Verification_List.pdf49.89 kBPDF Add
CR20090798_2009_GA_03_pAl09_009.pdf122.43 kBPDF Add
CR20090798_2009_GA_04_pAl09_010.pdf187.83 kBPDF Add
CR20090798_2009_GA_05_pAl09_011.pdf87.88 kBPDF Add
CR20090798_2009_GA_062_WAp46452.pdf140.38 kBPDF Add
CR2009-0798_Appendix1.zip89.07 MBZIP Add
CR2009-0798_Appendix2.zip25.43 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader