Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87531
Export to Endnote
Title: Annual exploration report Year 11 MLN 1154 Merlin 15 June 2008 to 14 June 2009
Title Holder / Company: Merlin Diamonds
North Australian Diamonds
Report id: CR2009-0552
Tenure: MLN1154
Year: 2009
Author: Reddicliffe, T
Abstract: Activities completed during the reporting period included the processing of core and pit samples for total diamond content. This work is being done to determine resource grades and to confirm the continuation of grade at depth within the tested pipes. As a prelude to undertaking prefeasibility production trials, the Merlin pilot processing plant is being upgraded in a series of stages aimed at increasing throughput to in excess of 50tph and to also test a number of process components to enable the finalization of the processing flowsheet. Two programs of resource definition drilling were completed during the previous reporting period. The first program targeted the Gawain pipe and included a total of 11 diamond drill holes (NMGW-001 to NMGW-011) for a total of 2,432 metres. The second program targeted the Palsac pipe and included a total of two diamond drill holes (NMPS-001, NMPS-002) for a total of 1,242 metres.
Date Added: 30-Jul-2018
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
ML1154_2009_A_01.pdf195.75 kBPDF Add
ML1154_2009_A_02_Drill_Logs.xls50 kBMicrosoft Excel Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader