Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87305
Export to Endnote
Title: Mount Shoobridge Project ERL 88 Annual report for the period 19 September 2008 to 18 September 2009
Title Holder / Company: Australian Tantalum
Haddington Resources
Report id: CR2009-0796
Tenure: ERL88
Year: 2009
Author: de Kever, N
Abstract: Exploration conducted on ERL 88 during the reporting period included ongoing literature reviews, a geophysical (VTEM) survey, and reconnaissance rock chip sampling.
Date Added: 29-Jun-2018
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
ERL88_2009_A.pdf3.1 MBPDF Add
CR2009-0796_Data.zip692.02 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader