Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87301
Export to Endnote
Title: EL 25668 Mt Todd Project Annual report for the period ended 17 August 2009
Title Holder / Company: Vista Gold Australia
Report id: CR2009-0662
Tenure: EL25668
Year: 2009
Author: Harris, P
Abstract: EL 25668 is situated approximately 40 km east of the town of Pine Creek. This annual report documents the work completed on EL 25668 for the period August 17, 2008 to August 16, 2009. EL 25668 is the northernmost licence in the Vista Gold tenement package on the Mount Todd project. The southern boundary of EL 25668 adjoins EL 25669. EL 25668 is 35Km long by 800m wide, the eastern end thickens to 6Km with a total area of 114 square Km. The licence hosts the Australus soil anomaly and the northernmost strike extension of the Cullen-Australis structural corridor. The licence was originally granted on 17 August 2007 for a period of six (6) years. Vista Gold Australia Pty Ltd. is the operator and manager of the exploration work. Work on the project during the Reporting Year included structural interpretation, converting and loading historic data into mapinfo format and investigation of previous mineral occurrences.
Date Added: 26-Jun-2018
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25668_2009_A.pdf575.13 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader