Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87289Export to Endnote
| Title: | Annual report ELRs 46 - 55 Bigrlyi Project period ending 17 November 2009 |
| Title Holder / Company: | Energy Metals |
| Report id: | CR2009-0973 |
| Tenure: | ERL46; ERL47; ERL48; ERL49; ERL50; ERL51; ERL52; ERL53; ERL54; ERL55 |
| Year: | 2009 |
| Author: | Deutschman, A |
| Abstract: | The Bigrlyi project comprises ten granted Exploration Retention Licences (ERL's 46 to 55 inclusive) located 390 kilometres (by road) northwest of Alice Springs. The project is a Joint Venture between Energy Metals Limited with 53.3% (operator), Valhalla Uranium (a subsidiary of Paladin Resources Ltd) with 41.7% and Southern Cross Exploration NL with 5%. Uranium mineralisation was discovered at Bigrlyi by a joint venture managed by Central Pacific Minerals (CPM) in 1973. Exploration undertaken in the current reporting period 18 November 2008 to 17 November 2009 included: Further infrastructure additions to the Bigrlyi exploration camp; Resource modelling and estimations, using ordinary and MIK krigeing methodologies; 9 diamond holes for 750m, including 5 wedges, for metallurgical sampling; 67 RC holes for 8118m, including 10 precollars for metallurgical sampling; A detailed mineralogical and geochemical study of core samples; XRF analysis of sample pulps and RC cuttings; and Ongoing rehabilitation of drill sites. |
| Date Added: | 24-Jun-2018 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| CR20090973_2009_GA.pdf | 531.96 kB | Add | |
| CR2009-0973_Appendix1.zip | 14.13 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.