Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87176
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKemp, Ren_US
dc.date.accessioned2018-05-27T23:05:59Z-
dc.date.issued2011en_US
dc.identifier.govdocCR2011-1146en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87176en_US
dc.description.abstractDuring the reporting period, work conducted on the George tenement was limited to a perfunctory field reconnaissance visit to review the proposed drill program and to provide an introduction to the George Project. Some rock chipping was conducted and several radiometric anomalies were visited in an attempt to refine/define an RC drill program, which was conducted in November 2011. The proposed program was modified, seven holes were planned for the George tenement however, two of those holes were not cleared for earthworks and one proposed hole was cleared, but not drilled. Four holes were drilled for a total of 390m at two localities, the George Creek and Bowerbird prospects. Three uranium anomalous intervals were intersected in BBRC002. The first was from 22-23m at 1870ppm U (2205ppm U3O8), the second was from 27-28m at 720ppm U (849ppm U3O8) and the third was from 32-33m at 129ppm U (152ppm U3O8).en_US
dc.subject.classificationUraniumen_US
dc.subject.classificationReconnaissanceen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationRC drillingen_US
dc.subject.classificationDrill collarsen_US
dc.subject.classificationDrill hole logsen_US
dc.subject.classificationDrill hole dataen_US
dc.subject.classificationMagnetic propertiesen_US
dc.subject.classificationMagnetic susceptibilityen_US
dc.subject.classificationGeochemical explorationen_US
dc.subject.classificationGeochemical samplingen_US
dc.subject.classificationScintillometersen_US
dc.subject.classificationRock chip samplingen_US
dc.subject.classificationDrill cuttings samplingen_US
dc.subject.classificationAssayingen_US
dc.subject.classificationAssay valueen_US
dc.titleAnnual report George Project EL 24550 for the period 12 December 2010 to 11 December 2011en_US
dc.relation.isatmap100Batchelor 5171en_US
dc.relation.isatmap250Pine Creek SD5208en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.description.stratnameBurrell Creek Formation, Finniss River Group, South Alligator Group, Depot Creek Sandstone, Tolmer Groupen_US
dc.description.geochemicalsampling2 Rock chip samplesen_US
dc.description.geochemicalsampling142 RC drill samplesen_US
dc.description.drilling4 RC holes for 390 m (GCKRC012, GCKRC013, BBRC001 and BBRC002)en_US
dc.description.mineprospectnameAdelaide River Mineen_US
dc.description.mineprospectnameBowerbirden_US
dc.description.mineprospectnameGeorge Creek Prospecten_US
dc.identifier.tenureEL24550en_US
dc.description.modifyhistory16/02/2012en_US
dc.description.modifyhistory24/01/2013en_US
dc.description.modifyhistory16/09/2013en_US
dc.contributor.holderAldershot Resourcesen_US
dc.contributor.holderRoyal Resourcesen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2011en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24550_2011_A.pdf1.19 MBPDF Add
CR2011-1146_Data.zip202.41 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader