Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87116
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.date.accessioned | 2018-04-17T22:32:49Z | - |
dc.date.issued | 2014 | en_US |
dc.identifier.govdoc | PR2015-0018 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87116 | en_US |
dc.description.abstract | Quantec Geoscience Ltd carried out the 2014 Glyde 3D DCIP/MT Survey on behalf of Armour Energy Ltd within EP171 in the McArthur Basin, located approximately 95kms south of Borroloola, NT. The geophysical survey covered an area of about 9 Sq.km with its focus centered in Gylde Sub-basin, near the recently drilled Glyde ST1. The main purpose of this survey was to assist in the definition of the vertical and lateral extent of the gas accumulation at Glyde, to further de-risk the of future wells. | en_US |
dc.subject.classification | Basemaps | en_US |
dc.subject.classification | Acquisition operations | en_US |
dc.subject.classification | Processing data | en_US |
dc.title | 2014 Glyde Direct Current Induced Polarisation (DCIP) & - Magnetotelluric (MT) Survey - Survey Acquisition & Processing Report | en_US |
dc.type | DCIP MT Surveys and Analysis | en_US |
dc.relation.isatmap250 | Bauhinia Downs SE5303 | en_US |
dc.relation.isatmap250 | Wallhallow SE5307 | en_US |
dc.relation.isatgeolprovince | McArthur Basin | en_US |
dc.relation.isatgeolprovince | McArthur Basin - Batten Trough | en_US |
dc.identifier.tenure | EP171 | en_US |
dc.identifier.tenure | EP190 | en_US |
dc.description.publicnotes | Support data (134GB) is available free of charge. | en_US |
dc.description.modifyhistory | 17/04/2018 | en_US |
dc.contributor.corpauthor | Quantec Geoscience | en_US |
dc.contributor.holder | Armour Energy | en_US |
dc.identifier.collectionname | Petroleum Geophysical Surveys (PEX Geophysics) | en_US |
dc.identifier.govdocprefix | PR2015 | en_US |
dc.identifier.surveyname | Glyde 3D DCIP/MTS 2014 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Petroleum Geophysical Surveys (PEX Geophysics) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR20150018_Acquistion_and_Processing_Report.pdf | 10.09 MB | Add | |
PR2015-0018_Field_and_Processing_Reports_and_Data.zip | 18.01 MB | ZIP | Add |
PR2015-0018_Geosoft_Results.zip | 32.43 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.