Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87098Export to Endnote
| Title: | Fourth annual report on EL 25313 from 30 May 2010 to 30 September 2011 and EL 28006 and EL 28007 from 2 November 2010 to 30 September 2011 Caranbirini, McArthur River Project |
| Title Holder / Company: | Brumby Resources |
| Report id: | CR2011-0725 |
| Tenure: | EL25313; EL28006; EL28007 |
| Year: | 2011 |
| Author: | Rohde, C |
| Abstract: | Exploration in the fourth year of tenure carried out by Brumby consisted of a VTEM survey covering all three tenements, a data review including previous exploration and regional geological data and drill planning Interpretation of the VTEM survey identified eleven targets for McArthur River Pb-Zn-Ag style mineralisation. The most promising target is Target 1, where the conductor is approximately 1,200 m long by 1,000 m wide. After modelling of the geophysical anomalies it is planned to test anomaly T1 with 2 deep diamond holes (ca 300m) and anomalies T3 and T4 with RC/Aircore to a depth of 100m. |
| NOTE: | Additional geophysics datasets are available on request |
| Date Added: | 10-Apr-2018 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| GR179_2011_GA_01.pdf | 1.76 MB | Add | |
| GR179_2011_GA_02_Caranbirini_VTEM_Multiplots.pdf | 427.07 MB | Add | |
| GR179_2011_GA_03_SGC_Caranbirini_Interpretation_Memo.pdf | 12.98 MB | Add | |
| GR179_2011_GA_04_SGC_Caranbirini_VTEM_Modelling_Memo_26092011.pdf | 668.96 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.