Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86586
Export to Endnote
Title: | Eclipse Uranium Project Annual report on EL 24808 for the year ending 9 August 2007 |
Title Holder / Company: | Scimitar Resources |
Report id: | CR2007-0351 |
Tenure: | EL24808 |
Year: | 2007 |
Author: | McGuinness, S |
Abstract: | During the reporting period Scimitar Resources Limited commenced an airborne Radiometric/Magnetic survey covering EL 24808. This program, conducted by GPX Airborne, comprises 2,015 line km on 100m line spacings with 1000m tie spacings, and is part of a larger survey totalling about 30,000 line km including Scimitar neighbouring explorers, Energy Metals Limited and Alara Uranium Ltd. The airborne survey is ongoing at the time of reporting and as a result the final survey data is not yet available to Scimitar. Scimitar is targeting sandstone hosted uranium mineralisation within the Mount Eclipse Sandstone, similar to the adjacent Bigrlyi uranium deposit, held by Energy Metals Ltd. |
Date Added: | 30-Oct-2017 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24808_2007_A_01.pdf | 994.48 kB | Add | |
EL24808_2007_A_02_Verification_Listing.pdf | 35.75 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.