Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86360
Export to Endnote
Title: | Mt Shoobridge Project NT EL 25181 annual report for the period 6 November 2007 to 5 November 2008 |
Title Holder / Company: | Haddington Resources |
Report id: | CR2008-0875 |
Tenure: | EL25181 |
Year: | 2008 |
Author: | de Kever, N |
Abstract: | Exploration conducted on EL 25181 during the reporting period included reconnaissance field mapping and a small rock chip sampling program. Fourteen rock chips were taken from lithologies prospective for base metal and gold mineralisation. Results were generally disappointing, with only low levels of Au (maximum 128ppb Au), Pb (maximum 161ppm Pb), and Cu (maximum 440ppm Cu) returned. |
Date Added: | 2-Oct-2017 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25181_2008_A_01.pdf | 1.68 MB | Add | |
EL25181_2008_A_02_Surface_Location.txt | 1.94 kB | Text | Add |
EL25181_2008_A_03_Surface_Geochem.txt | 614 B | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.