Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86360
Export to Endnote
Title: Mt Shoobridge Project NT EL 25181 annual report for the period 6 November 2007 to 5 November 2008
Title Holder / Company: Haddington Resources
Report id: CR2008-0875
Tenure: EL25181
Year: 2008
Author: de Kever, N
Abstract: Exploration conducted on EL 25181 during the reporting period included reconnaissance field mapping and a small rock chip sampling program. Fourteen rock chips were taken from lithologies prospective for base metal and gold mineralisation. Results were generally disappointing, with only low levels of Au (maximum 128ppb Au), Pb (maximum 161ppm Pb), and Cu (maximum 440ppm Cu) returned.
Date Added: 2-Oct-2017
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25181_2008_A_01.pdf1.68 MBPDF Add
EL25181_2008_A_02_Surface_Location.txt1.94 kBText Add
EL25181_2008_A_03_Surface_Geochem.txt614 BText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader