Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86211
Export to Endnote
Title: EL 10335 5th Annual Report for the period ending 14 August 2007
Title Holder / Company: Hartz Range Mines
Report id: CR2007-0458
Tenure: EL10335
Year: 2007
Author: Winterbotham, MR
Abstract: Exploration of the Wollogorang Project by Hartz Range Mines Pty Ltd during the last period has been heavily focussed on EL 10335 with particular attention being paid to follow up work on targets generated from the recently completed airborne geophysical surveys. Work carried out during this period consists of completion and interpretation of the airborne magnetometric and radiometric surveys, editing and manipulation of the compiled database of previous exploration activity in the area, data assessment and target generation. Field work has been intensified during this field season with ground IP surveys, detailed geological mapping and rock sampling and widespread reconnaissance mapping and rock sampling. Several new targets have been identified for follow up work including ground EM surveys and drilling in the next period. A field camp has been established just north of the main road between Wollogorang Station and Redbank Mine. Lagoon Creek Resources Pty Ltd continued operations on the Debbil Debbil Uranium Project in the southern part of the EL. Work consisted of a stream sediment geochemical survey, geophysical data analysis, drilling and reconnaissance mapping. Field camp construction has been completed.
Date Added: 13-Sep-2017
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL10335_2007_A.pdf2.27 MBPDF Add
CR2007-0458_Drilling_Logs.zip9.78 kBZIP Add
CR2007-0458_Figures.zip52.34 MBZIP Add
CR2007-0458_Geochemical_Data.zip6.58 kBZIP Add
CR2007-0458_Geophysics.zip272.11 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader