Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85936
Export to Endnote
Title: | Noonamah Quarry, Elizabeth Valley, Annual report 2011 |
Title Holder / Company: | Holcim Australia |
Report id: | CR2011-1246 |
Tenure: | MLN387; MLN388; MLN389; MLN392; MLN393; MLN394; MLN396; MLN397 |
Year: | 2011 |
Abstract: | In 2001, Holcim, then CSR Readymix, prepared a Notice Of Intent with intentions of extracting the hard rock. Shortly after, local residents and environmental groups worked to reduce mining activities in the area. The load rating on the local roads was reduced to 10t, which eliminated any heavy traffic out of the quarry. As a result, extraction and haulage of the material was made difficult and there has been little to no activity on the site. Holcim plans to conduct assessments in the future with intentions of finding a solution to the haulage issue. |
Date Added: | 4-Aug-2017 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
NoonmahQuarry_2011_GA.pdf | 130.71 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.