Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85216
Export to Endnote
Title: | East Mereenie 35 Well Completion Report |
Title Holder / Company: | Canso Resources Farmout Drillers Moonie Oil Transoil Petromin Santos Magellan Petroleum United Oil and Gas |
Report id: | PR1994-0026 |
Tenure: | OL5 |
Year: | 1995 |
Corporate Author: | Santos Australia |
Drillhole/Well Name: | East Mereenie 35 |
Rig release date: | 16/09/1994 |
NOTE: | East Mereenie 35 was sidetracked at 1243 metres after the drill pipe twisted off. The well was initially renamed East Mereenie 35 ST1 but is now referred to as East Mereenie 35 by Santos because only minimal hole was redrilled. Digital Logs added to this record |
Document Type: | Well Completion Report |
Date Added: | 5-May-2017 |
Appears in Collections: | Petroleum Wells (PEX Wells) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EM35_WellCompletionReport.pdf | 874.01 kB | Add | |
PR1994-0026_EM35_Appendices.zip | 4.94 MB | ZIP | Add |
PR1994-0026_EM35_Enclosures.zip | 2.67 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.