Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85216
Export to Endnote
Title: East Mereenie 35 Well Completion Report
Title Holder / Company: Canso Resources
Farmout Drillers
Moonie Oil
Transoil
Petromin
Santos
Magellan Petroleum
United Oil and Gas
Report id: PR1994-0026
Tenure: OL5
Year: 1995
Corporate Author: Santos Australia
Drillhole/Well Name: East Mereenie 35
Rig release date: 16/09/1994
NOTEEast Mereenie 35 was sidetracked at 1243 metres after the drill pipe twisted off. The well was initially renamed East Mereenie 35 ST1 but is now referred to as East Mereenie 35 by Santos because only minimal hole was redrilled. Digital Logs added to this record
Document Type: Well Completion Report
Date Added: 5-May-2017
Appears in Collections:Petroleum Wells (PEX Wells)

Files in this Report:
File SizeFormat Add to
Download
EM35_WellCompletionReport.pdf874.01 kBPDF Add
PR1994-0026_EM35_Appendices.zip4.94 MBZIP Add
PR1994-0026_EM35_Enclosures.zip2.67 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader