Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85193
Export to Endnote
Title: | Palm Valley - 11ST Well Completion Report |
Title Holder / Company: | Magellan Petroleum |
Report id: | PR2004-0057 |
Tenure: | PL3 |
Year: | 2004 |
Corporate Author: | Magellan Petroleum (NT) |
Drillhole/Well Name: | Palm Valley 11ST |
Rig release date: | 13/08/2004 |
NOTE: | Palm Valley 11 and 11ST WCR is combined, as the original well was sidetracked after the bottom hole assembly twisted off and was unable to be recovered. The first attempt to sidetrack failed when the drilling bit hit the fish. The second attempt to sidetrack was successful. |
Document Type: | Well Completion Report |
Date Added: | 4-May-2017 |
Appears in Collections: | Petroleum Wells (PEX Wells) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PV11_WellCompletionReport.pdf | 10.12 MB | Add | |
PR2004-0057_PV11_Appendices.zip | 40.29 MB | ZIP | Add |
PR2004-0057_PV11_Enclosures.zip | 48.32 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.