Please use this identifier to cite or link to this item:
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/84605
Title: | Seismic Reinterpretation of the Orange Structure |
Title Holder / Company: | Pancontinental Petroleum |
Report ID: | PR1984-0061 |
Tenure: | OP175 |
Year: | 1984 |
Corporate Author: | Pancontinental Petroleum |
Survey Name: | Pancontinental 2D SS 1980 - 1982 Missionary Plain 2D SS 1965 Mt Reenie-Ooraminna 2D SS 1966 Central Amadeus 2D SS 1974 |
Survey Lines: | 3-1; 3-2; 3-2XD; 3-A; 73-3-1.5; 73-3-1.6; 73-4-1.1; 73-4-1.5; 73-4-1.6; P80-8; P80-9; P80-11 |
Geological Province: | Amadeus Basin |
Map250: | Alice Springs SF5314 Henbury SG5301 Hermannsburg SF5313 Kulgera SG5305 Lake Amadeus SG5204 Rodinga SG5302 |
Subject: | Interpretation results Velocity maps Basemaps Isopach maps Depth structure maps |
Abstract: | This report details the following attempt to allow a definite mapping of the Orange structure in OP175 due to the problems encountered with the acquired seismic data over the area. This is so that an optimum location for Orange No.2 well can be drilled on the Orange structure, which currently severely constrained. The report reviews the assumptions to overcome the problems and the limitations of mapping based on those assumptions. |
Document Type: | Seismic Interpretation |
Appears in Collections: | Petroleum Geophysical Surveys (PEX Geophysics) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR19840061_Orange_Seismic_Reinterpretation_Report.pdf | 399.78 kB | Add | |
PR1984-0061_Orange_Reinterpretation_Report_Enclosures.zip | 2.81 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.