Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/84362
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.date.accessioned | 2017-03-23T00:35:26Z | - |
dc.date.issued | 1990 | en_US |
dc.identifier.govdoc | PR1991-0035 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/84362 | en_US |
dc.description.abstract | The 1990 McArthur Seismic Survey was carried out by Geo Systems Pty Ltd for Pacific Oil and Gas Pty Ltd within Exploration Permits EP24, EP18 & EP19 located in the McArthur Basin, approximately 70kms east north-east, south-east of Daly Waters. Approximately 307kms of 83.33 fold, 500 channel reflection profiling was recorded between 20 August and 24 September 1990. This report covers various field operations relating to line clearing, drilling, velocity survey, chaining and survey crews, recording and processing. | en_US |
dc.subject.classification | Acquisition logistics | en_US |
dc.subject.classification | Basemaps | en_US |
dc.subject.classification | Faults | en_US |
dc.subject.classification | Horizons | en_US |
dc.subject.classification | Infield data processing and QC | en_US |
dc.subject.classification | Interpretation results | en_US |
dc.subject.classification | Interpreted seismic sections | en_US |
dc.subject.classification | Line diagrams | en_US |
dc.subject.classification | Line listings | en_US |
dc.subject.classification | Processing data | en_US |
dc.subject.classification | Point gathers | en_US |
dc.subject.classification | Preliminary stacks | en_US |
dc.subject.classification | Processed seismic lines | en_US |
dc.subject.classification | Seismic stratigraphy | en_US |
dc.subject.classification | Statics corrections | en_US |
dc.subject.classification | Surveys operations | en_US |
dc.subject.classification | Time structure maps | en_US |
dc.subject.classification | Velocity acquisition | en_US |
dc.subject.classification | Velocity analysis | en_US |
dc.subject.classification | Well ties | en_US |
dc.title | 1990 McArthur Basin Seismic Survey - Seismic Acquisition, Processing & Interpretation Reports | en_US |
dc.type | Seismic Acquisition | en_US |
dc.type | Seismic Processing | en_US |
dc.type | Seismic Interpretation | en_US |
dc.relation.isatmap250 | Daly Waters SE5301 | en_US |
dc.relation.isatmap250 | Tanumbirini SE5302 | en_US |
dc.relation.isatmap250 | Larrimah SD5313 | en_US |
dc.relation.isatmap250 | Hodgson Downs SD5314 | en_US |
dc.relation.isatgeolprovince | McArthur Basin | en_US |
dc.relation.isatgeolprovince | Beetaloo Sub-basin | en_US |
dc.identifier.tenure | EP24 | en_US |
dc.identifier.tenure | EP19 | en_US |
dc.identifier.tenure | EP18 | en_US |
dc.contributor.corpauthor | Geo Systems | en_US |
dc.contributor.corpauthor | Pacific Oil and Gas | en_US |
dc.contributor.corpauthor | Simon Petroleum Technology | en_US |
dc.contributor.holder | Pacific Oil and Gas | en_US |
dc.contributor.holder | Pardi | en_US |
dc.identifier.collectionname | Petroleum Geophysical Surveys (PEX Geophysics) | en_US |
dc.identifier.govdocprefix | PR1991 | en_US |
dc.identifier.surveyname | McArthur Basin 2D SS 1990 | en_US |
dc.identifier.surveyline | SH90-100 | en_US |
dc.identifier.surveyline | SH90-102 | en_US |
dc.identifier.surveyline | SH90-103 | en_US |
dc.identifier.surveyline | SH90-105 | en_US |
dc.identifier.surveyline | SH90-107 | en_US |
dc.identifier.surveyline | SH90-109 | en_US |
dc.identifier.surveyline | EL90-201 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Petroleum Geophysical Surveys (PEX Geophysics) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR19910035_1990_McArthur_Basin_2D_SS_Final_Acquisition_Report.PDF | 17.58 MB | Add | |
PR1991-0035_1990_McArthur_Basin_2D_SS_Final_Seismic_Processing_Report_Elsey_Scarlet_Hill_Area.pdf | 540.62 kB | Add | |
PR19910035_1990_McArthur_Basin_2D_SS_Interpretation_Report_EP18_Scarlet_Hill_Area.PDF | 1.16 MB | Add | |
PR19910035_1990_McArthur_Basin_2D_SS_Interpretation_Report_EP19_Elsey_Area.pdf | 300.89 kB | Add | |
PR1991-0035_Interpretation_Report_EP18_Scarlet_Hill_Area_Enclosures.zip | 1.54 MB | ZIP | Add |
PR1991-0035_Interpretation_Report_EP19_Elsey_Area_Enclosures.zip | 2.87 MB | ZIP | Add |
PR1991-0035_Shotpoint_Base_Maps.zip | 302.15 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.