Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83958
Export to Endnote
Title: | Ewan Edward Project Partial report for the period 10 February 2014 to 24 October 2015 |
Title Holder / Company: | Truscott Mining |
Report id: | CR2016-0458 |
Tenure: | EL27731 |
Year: | 2016 |
Author: | Hanson, J |
Abstract: | The sixth anniversary of exploration licence EL 27731 occurred on the 23 August 2016. At that time Partial blocks SE5333198W, SE533198X and SE533198L were surrendered. The reasons for surrender can be seen in Figure 4 where the main drilling targets for The Hera Project, tenement EL 27731 are shown. Firstly the partial drop off areas do not fall within the projected target zones. Secondly the partial block areas are long and narrow (some 386 m in width) making minable target prediction within this area difficult. Due to the size and shape of the area to be dropped there has been only minimal exploration activities carried out within this zone. Some minor Gravity geophysics and some field walking, but structures were not recorded because to do so in full required that the structural mapping would need to be extended to adjacent ground which is recorded on Government Data base maps as being Aboriginal owned with restricted access. |
NOTE: | See previous Annual Reports for Geophysical Survey Data |
Date Added: | 22-Dec-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL27731_2016_P_01.pdf | 1.08 MB | Add | |
EL27731_2016_P_02_Appendix1.tif | 3.42 MB | TIFF | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.