Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83950
Export to Endnote
Title: GR285 Combined annual technical report for period 2 April 2013 to 1 April 2014
Title Holder / Company: Toro Energy
Report id: CR2014-0372
Tenure: EL26987;  EL27301;  EL29396
Year: 2014
Author: Tandy, A
Abstract: During the reporting period no exploration activities were undertaken across any of the tenements included in this report. During the year there were significant staff changes, including the Exploration Manager and time was spend by the new manager assessing the tenements and analysis the data Toro had gained since the granting of the tenements. The new exploration manager has also spent time reviewing historic data and re-interpreting the geology. A field reconnaissance trip was undertaken to assess the tenement and visually identify areas of interest. The results of this trip will be used to develop a field programme for the next field season. The last activity undertaken over the year was the assessment of the tenements to determine prospectivity. As much of the land held is not prospective for the type of uranium deposits targeted, time was devoted to deciding what parts of each tenement could, and would be surrendered. Tenement EL 29396 has been surrendered by Toro during the reporting period.
Date Added: 22-Dec-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR285_2014_GA.pdf3.51 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader