Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83509
Export to Endnote
Title: North Arunta Project, Anningie Joint Venture EL 23271 Annual report for the period ending 22 October 2003
Title Holder / Company: Falconbridge Australia
Report id: CR2003-0421
Tenure: EL23271
Year: 2003
Author: Ascough, G
Abstract: Work was limited to the geophysical surveys and geophysical interpretations. A GEOTEM airborne electromagnetic/magnetic was conducted over the area and two low magnetic targets have been identified that require further testing.
Date Added: 13-Oct-2016
Appears in Collections:Minerals Exploration Reports (MEX)



Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader