Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83400
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFulton, Ren_US
dc.date.accessioned2016-09-27T23:04:33Z-
dc.date.issued2010en_US
dc.identifier.govdocCR2010-0448en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83400en_US
dc.description.abstractWork completed for the year included drill planning followed by the construction of approximately 37 kilometres of access tracks and 23 RC drill sites. Drilling is due to commence on or about the 12 July 2010. Approximately 11.1 hectares of disturbance was created by track construction and 1 hectare of disturbance was created by drill pad construction. A comprehensive environmental impact study for the Wonarah Phosphate Project formed part of the feasibility study which was completed in June 2010.en_US
dc.subject.classificationPhosphate rocken_US
dc.subject.classificationPhosphatesen_US
dc.titleAnnual report for period ending 2 July 2010 EL 24607 Wakayaen_US
dc.relation.isatmap100Wonarah 6158en_US
dc.relation.isatmap100Joildung 6157en_US
dc.relation.isatmap250Alroy SE5315en_US
dc.relation.isatmap250Frew River SF5303en_US
dc.relation.isatgeolprovinceGeorgina Basinen_US
dc.identifier.tenureEL24607en_US
dc.description.modifyhistory23/08/2010en_US
dc.contributor.holderMinemakersen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2010en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24607_2010_A_01.pdf328.33 kBPDF Add
EL24607_2010_A_02_Figure2.pdf32.94 kBPDF Add
EL24607_2010_A_03_Figure3.pdf34.59 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader