Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83389
Export to Endnote
Title: | Annual report for EL 24557 Mount Thomas Project for the period 7 December 2006 to 6 December 2007 |
Title Holder / Company: | Aldershot Resources |
Report id: | CR2007-0607 |
Tenure: | EL24557 |
Year: | 2007 |
Author: | Watchman, A Hall, G |
Abstract: | The Mt Thomas project is located 20 km north-northeast of the Daly River settlement and 125 km south-southwest of Darwin in the Northern Territory. The project area covers 20 blocks and 66.76 km² and was explored since the 1970s for uranium. This report details exploration activities undertaken by Aldershot Resources Ltd during the tenement's second year of tenure: 7 December 2006 to 6 December 2007. Activities completed during the reporting period consisted of reconnaissance field inspections, historic drill hole location surveying, limited ground radiometric surveys, and rock chip sampling. |
Date Added: | 27-Sep-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24557_2007_A.pdf | 1.05 MB | Add | |
CR2007-0607_Data.zip | 3.95 kB | ZIP | Add |
CR2007-0607_Figures.zip | 555.03 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.