Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83389
Export to Endnote
Title: Annual report for EL 24557 Mount Thomas Project for the period 7 December 2006 to 6 December 2007
Title Holder / Company: Aldershot Resources
Report id: CR2007-0607
Tenure: EL24557
Year: 2007
Author: Watchman, A
Hall, G
Abstract: The Mt Thomas project is located 20 km north-northeast of the Daly River settlement and 125 km south-southwest of Darwin in the Northern Territory. The project area covers 20 blocks and 66.76 km² and was explored since the 1970s for uranium. This report details exploration activities undertaken by Aldershot Resources Ltd during the tenement's second year of tenure: 7 December 2006 to 6 December 2007. Activities completed during the reporting period consisted of reconnaissance field inspections, historic drill hole location surveying, limited ground radiometric surveys, and rock chip sampling.
Date Added: 27-Sep-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24557_2007_A.pdf1.05 MBPDF Add
CR2007-0607_Data.zip3.95 kBZIP Add
CR2007-0607_Figures.zip555.03 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader