Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83386
Export to Endnote
Title: Fourth Annual technical and final report EL 29019 for period ending 11 April 2016
Title Holder / Company: Tellus Holdings
Report id: CR2016-0305
Tenure: EL29019
Year: 2016
Author: Livesey, J
Abstract: The Chandler Project consists of six exploration licenses held by Tellus Holdings Ltd ('Tellus'), located in the Amadeus Basin, approximately 130km south of Alice Springs. This final annual report relates to one of the exploration licenses; EL 29019 South Charlotte for the reporting period ending 11th April 2016. The Chandler Project is targeting subsurface salt deposits to assess potential evaporitic mineralisation within the Amadeus Basin. Two known salt units are present in the Chandler project area, namely the Chandler Formation and the deeper Gillen Salt Member. Tellus are targeting the Chandler Salt Formation. Tellus completed a diamond drilling program on nearby tenement EL 29018. Core sampling collection and wireline logging were completed. Geochemical and mineralogical analysis results were positive confirming massive halite unit. During the reporting period environmental studies continued over the Chandler project site, including water investigation studies, water bore drilling, flora and fauna surveys and soil assessment to support the EIS for MLA 30612. The wireline and stratigraphic information resulting from the drilling program were used to update the seismic interpreted geological model over the project area and assist in mine planning studies.
NOTEOne seismic line from work completed over EL 29018 falls within EL 29019. See CR2016-0304 for details.
Date Added: 27-Sep-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL29019_2016_AS.pdf1.43 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader