Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83381
Export to Endnote
Title: EL 26287 Mount Denison Annual technical report for period 1 April 2008 to 1 April 2009
Title Holder / Company: Toro Energy
Report id: CR2009-0221
Tenure: EL26287
Year: 2009
Author: Rawlings, D
Abstract: Field exploration activities conducted by Toro Energy on this tenement during the reporting period comprise only reconnaissance 4WD and foot traverses. No samples were collected and analysed. A literature review has been undertaken and is outlined below. Toro are planning a regional scale Airborne Electromagnetic (AEM) survey to be conducted during the latter part of 2009 in an effort to identify basement conductors and palaeochannels that may be host to uranium mineralisation. No drilling is planned at this stage. Exploration in the Reynolds Range Project has been held back to allow grant of other adjoining tenements, so that a coherent and contiguous land package can be flown. In addition, Native Title negotiations have also been initiated with the Central Land Council. Toro are actively seeking an Exploration Agreement be in place prior to any ground disturbing work.
Date Added: 27-Sep-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL26287_2009_A.pdf1.65 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader