Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83355
Export to Endnote
Title: Annual technical report EL 29019 for period ending 11 April 2015
Title Holder / Company: Tellus Holdings
Report id: CR2015-0452
Tenure: EL29019
Year: 2015
Author: Livesey, J
Abstract: One seismic line falls within EL 29019 and is part of the Chandler Project seismic model. RPS Canada reviewed the newly acquired drillhole and wireline data. The full wave sonic data was used to tie the drillhole to the seismic survey lines. The time - depth relationship was calculated for intersected marker beds and used to convert the seismic from time domain to depth domain. The interpretive geological model over the project area has been updated and refined
Date Added: 27-Sep-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL29019_2015_A.pdf2.32 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader